Table 3. Characteristics of the “Construction of FOCL along the bed of the Caspian Sea” project
The “Construction of fibre-optic communication line along the Caspian seabed “ project
The project is aimed at the construction of the submarine fibre-optic communication line (FOCL) along the bed of the Caspian Sea along the Aktau (Republic of Kazakhstan) — Sumgait (Republic of Azerbaijan) route within the framework of the intergovernmental agreement between the countries.
The implementation of the project provides for the creation of a high-speed data transmission channel with high throughput capacity, ensuring direct connection between the digital infrastructures of Kazakhstan and international data transmission networks.
During 2025, the key stages of the project were performed; all desktop research and preparatory stages were completed. The laying of the submarine cable is scheduled for 2026.
Enhancement of the resilience and reliability of the international digital connectivity of the Republic of Kazakhstan;
Creation of an alternative access route to the global Internet network and reduction of dependence on existing channels;
Development of Kazakhstan’s transit potential within the framework of the Europe — Asia digital corridor;
Increase of the Company’s revenues through the development of international traffic transit;
Strengthening of the country’s technological independence and digital sovereignty;
Creation of an infrastructure base for the growth of international traffic and the development of cloud and digital services;
Support for the long-term development of the digital economy and integration into the global digital ecosystem.
2025–2026
Implementation